• Abu Dhabi UAE

  • Office hours 7:30 to 4:30

Follow Us On:

Major Projects Carried Out By Petro Gas (Agencies)

1.Pump Mechanical Seals :-

Petro Gas (Agencies) with the co-operation & technical support of our principal Flowserve Netherland completed several supply project for Mechanical Seals for different pump manufacturers, pump sizes, capacities & different applications for the following companies during 1990 up to date.

  •  

    ADCON onshore oil fields (5 major fields)

  •  

    ADCON offshore oil fields (Umm Sheif & Lower Zakum)

  •  

    ADCON offshore oil fields (Upper Zakum, Satah, North Satellite)

2.Compressor, Mechanical Seals & Retrofits :-

  •  

    With the technical support of our principal Flowserve Canada, Houston & Germany, PetroGas completed a GASCO project 2010 for 2 GASCO packages at ASAB field.

  •  

    A large value project for retrofit of 19 compressors packages is going on since early 2011 for GASCO different onshore gas processing plants.

3.Nitrogen Generator :-

Petro Gas (Agencies) are currently executing a project for GASCO expected to be completed end May 2012. The project consists of installing, testing & commissioning of 8 numbers Stand-Alone Nitrogen supply units.

4. ADNOC GAS Seal Systems upgrade and Gas Compressor Retrofit:-

The above study is for a complete system for 27 units gas conditioning including control system software integration. Several projects started October 2011 and Its completed in 2017.

5. ADNOC Dry Gas Seal Upgrade and Retrofit:-

This project is carried out for ADNOC Abu Dhabi for the study & evaluation for offshore Gas packages, Dry Gas seal retrofit. Project completed in 2013. This is carried out with the technical back up of Flowserve.

6.Department of Civil Aviation (Dubai Airports) :-

Supply, installation & commissioning of valves & actuators for Jet 1A Fuel Tank Farms. Several projects from 2006 & continued till 2013. This is completed with Cameron Valves & Measurement, material supply & technical support. Cameron are our USA principals.

7. Abu Dhabi, Dhafra, Safran & Al Ain Airports :-

Supply, installation & commissioning of valves & equipment for Jet 1A Fuel Tank Farm through our principals Cameron Valves USA.

8. Dubai International Airport Phase II :-

Supply, installation & commissioning of valves & control equipment for the Jet 1A Fuel during 2003, 2005, 2006, 2010 & 2011 several projects with technical support of Cameron USA.

9. Muscat International Airport :-

Supply, installation & commissioning of Fuel Hydrant System.

10. ENOC / EPPCO Berth 5 & Berth 9 :-

Complete valve & tie in system supplied & supported by Cameron USA, during 2005, 2006, 2008, 2009, 2010 & 2011 several projects.

11. All ADNOC Onshore Fields :-

Supply of water well equipment for well services. The project started 1982 up to date with continuous extension. Material is supplied by our German Principals German Water & Energy Group (GWE).

12. Supply of Catalyst Protection :-

Material consists of ceramic balls, inert balls & ceramic geometric shapes & demister pads for oil & gas treatment coloumns in gas plants & refineries. This is carried out with the support of our German principals VFF. The service is provided to GASCO, all gas plants at onshore gas fileds, Takreer refineries at Ruwais & Umm Al Nar.

13.Blending & Sampling System :-

We have carried out several turn key projects for ADMA 2001, & 2011 and for Fujairah Tank Farm, ADNOC Jebel Dhanna shipping terminal, ADNOC Fod different refined products tank farm. Those projects are constructed, built up, installed & commissioned with the technical assistance of our principals Cameron (Jiskoot Auto Sampling System) UK.